Soft deck under the tear-off.
The crew finds 180 square feet of bad deck by the east drains. Photos are logged, and a COR at your per-square-foot deck price is drafted the same day for your PM.
Craftpath runs the back office for commercial roofing contractors: squares installed, stored membrane, deck change orders, monthly pay apps and collections. Your PMs review and approve every step.

Foreman · Northgate Distribution
Area A: 42 squares of membrane down today. Found soft deck by the east drains.
March pay app
LoggedWas 0% in February · 7 photos attached
What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.
Tear-off, insulation, membrane and flashing, by roof area. Crews text squares, and Craftpath turns them into a G703 your PM can check line by line.
Northgate Distribution · Pay app #3
Continuation sheet · Period to March 31
| Description of work | Scheduled | Complete | This period |
|---|---|---|---|
| Tear-off, Area B$38,000 scheduled | $38,000 | 100% | $15,200 |
| Insulation, Area B$54,000 scheduled | $54,000 | 80% | $27,000 |
| Membrane, Area B, stored$88,000 scheduled | $88,000 | Stored | $22,800 |
| Membrane, Area A$96,000 scheduled | $96,000 | 65% | $62,400 |
What roofing contractors ask before they start.
Yes. By area, building or system, the way your schedule of values is written. Crews text squares installed, and Craftpath turns them into percent complete for your PM to check.
You do. When a crew finds bad deck or hidden damage, Crafty collects the square footage, location and photos, and Craftpath drafts the COR at your contract unit price. Your PM sets the final price and approves it before anything goes to the GC.
Yes. Membrane, insulation and coverboard delivered or craned up before install go on the stored materials column, with the invoice and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.
No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.
Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.
Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.
No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.
Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.
Bring a recent pay app. 30 minutes.