You set the glass.
We handle the paperwork that gets you paid.

Craftpath runs the back office for glazing contractors: fabrication, stored units, install progress, change orders, monthly pay apps and collections. Your PMs review and approve every step.

Glaziers on scaffolding installing a glass curtain wall

Foreman · Meridian Tower

East elevation: 24 units set on L5. Two lites cracked on delivery.

March pay app

Logged
Curtain wall, East55%

Was 35% in February · 2 damaged lites logged

A month on a glazing job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Units fabricated, shipped and set, tracked by elevation and floor.
    • Photos of installed units and damaged lites land in the job file.
    • Added openings and field changes flagged the same day.
  2. 02

    Change orders

    • Field changes and added openings priced at your rates and markup.
    • The COR goes to the GC with the RFI, shop drawing revision and photos.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • Units in your shop or on site billed as stored materials.
    • A pencil draft by elevation and floor, ready before the GC’s cutoff.
    • Final G702 and G703 with the conditional waiver and COI attached.
  4. 04

    Getting paid

    • Kickbacks fixed and resubmitted, not pushed to next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked to closeout, with the water testing and warranties it’s waiting on.

Billed the way your SOV is written.

Curtain wall by elevation, storefront, stored units, glass and glazing. Craftpath turns shop and field progress into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Meridian Tower · Pay app #9

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Curtain wall, East$412,000 scheduled55%$82,400
Storefront, L1$96,000 scheduled30%$28,800
Units, stored offsite$380,000 scheduledStored$74,500
Glass and glazing, L5$128,000 scheduled25%$32,000
Work and stored this period
$217,700
Less 10% retainage
−$21,770
Current payment due
$195,930

Where it pays off.

Stored offsite · 40 units$74,500

Units in the yard, not on the building.

Forty units are finished but the floor isn’t ready. They’re billed as stored materials with the bill of sale, insurance and photos the GC asks for.

Curtain wall, East · L52 lites held

Cracked on delivery.

Two lites arrive cracked. The photos are logged, the replacements are tracked, and those units bill when they’re set, not before.

COR #8 · Lobby door addNeeds pricing

A door added to the storefront.

The GC adds a door at the lobby storefront. The foreman texts it in, and a COR with the frame, hardware, glass and labor is drafted for your PM.

Common questions.

What glazing contractors ask before they start.

Yes. Units in your shop or on site bill as stored materials, with the bill of sale, insurance and photos the GC requires. Your PM approves every line before it goes out.

You do. When a foreman reports an added opening or a field change, Crafty collects what was done, where and why, with photos, and Craftpath drafts the COR at your rates and markup with the shop drawing revision. Your PM sets the final price and approves it before anything goes to the GC.

Yes. Curtain wall bills by elevation and floor, the way your schedule of values is written, with storefront and glass on their own lines. Foremen text units set, and Craftpath turns them into percent complete for your PM to check.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →