Skip to content

You protect the site.
We handle the paperwork that gets you paid.

Craftpath runs the back office for fire protection contractors: field progress, test reports, change orders, monthly pay apps and collections. Your PMs review and approve every step.

Building riser room with fire alarm and life safety panels

Foreman · Harbor Point Office

Branch lines on L4 done. Hydro passed this morning. 38 heads set on L3.

March pay app

Logged
Branch lines, L4100%

Was 40% in February · test report attached

A month on a fire protection job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Foremen text progress by floor: mains, branch lines, heads and trim.
    • Hydro test results and inspection photos land in the job file.
    • Added heads and relocations flagged the same day.
  2. 02

    Change orders

    • Added heads and relocations priced at your rates and markup.
    • The COR goes to the GC with photos and the revised layout.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • A pencil draft by floor and system, ready before the GC’s cutoff.
    • Pipe, heads and the fire pump on site billed as stored materials.
    • Final G702 and G703 with the conditional waiver and COI attached.
  4. 04

    Getting paid

    • Kickbacks fixed and resubmitted, not pushed to next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked to closeout, with the final acceptance and as-builts it’s waiting on.

Billed the way your SOV is written.

Mains, branch lines, heads and trim, by floor or zone. Crews text rough percentages, and Craftpath turns them into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Harbor Point Office · Pay app #6

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Mains, L4$46,000 scheduled100%$18,400
Branch lines, L4$58,000 scheduled100%$34,800
Fire pump, stored on site$64,000 scheduledStored$38,600
Heads and trim, L3$41,000 scheduled30%$12,300
Work and stored this period
$104,100
Less 10% retainage
−$10,410
Current payment due
$93,690

Where it pays off.

Branch lines, L4Hydro passed

Test passed, line billed.

The L4 hydro test passes the week before the cutoff. The test report and photos go in the job file, and branch lines bill at 100% this month.

COR #7 · Lobby head relocationsNeeds pricing

Twelve heads moved for a ceiling change.

The architect drops the lobby ceiling. The foreman texts the relocations, and a COR with heads, pipe, labor and the revised layout is drafted for your PM.

Retainage · Harbor PointTracked

Closeout without the chase.

Retainage is tracked by job, with the final acceptance, as-builts and certificates it’s waiting on listed in one place.

Common questions.

What fire protection contractors ask before they start.

Yes. Craftpath follows your schedule of values as it’s written: mains, branch lines, heads and trim, by floor or zone. Foremen text rough percentages, and Craftpath maps them to the right lines for your PM to check.

You do. When a foreman reports added heads or relocations, Crafty collects what was done, where and why, with photos, and Craftpath drafts the COR at your rates and markup with the revised layout. Your PM sets the final price and approves it before anything goes to the GC.

Yes. A fire pump, pipe or heads that arrive before they’re installed go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →

See it on your fire protection jobs.

Bring a recent pay app. 30 minutes.

Book a call