Skip to content

You run the pipe.
We handle the paperwork that gets you paid.

Craftpath runs the back office for plumbing contractors: phase progress, fixture changes, monthly pay apps and collections. Your PMs review and approve every step.

Foreman · Cedar Park Apartments

Underground done in building B. Top-out on L2 about 50.

March pay app

Logged
Top-out, L250%

Was 0% in February · 5 photos attached

A month on a plumbing job.

What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.

  1. 01

    In the field

    • Foremen text progress by phase: underground, rough-in, top-out, trim.
    • Test photos and signed inspection cards land in the job file.
    • Added fixtures and relocations flagged the same day.
  2. 02

    Change orders

    • Fixture adds and relocations priced at your rates and markup.
    • The COR goes to the GC with photos, the revised sheet and the RFI.
    • Approved COs are added to the schedule of values for next month.
  3. 03

    Billing

    • A pencil draft by phase and floor, ready before the GC’s cutoff.
    • Fixtures and water heaters on site billed as stored materials.
    • Final G702 and G703 with the conditional waiver and COI attached.
  4. 04

    Getting paid

    • Reduced percentages adjusted, with photos saved for next month.
    • Payments matched to each pay app, with unconditional waivers sent.
    • Retainage tracked by job until it’s released at closeout.

Billed the way your SOV is written.

Underground, rough-in, top-out and trim, by floor or building. Crews text rough percentages, and Craftpath turns them into a G703 your PM can check line by line.

  • Last month’s percent carried forward
  • Stored materials on their own column
  • Retainage held at your contract rate

Cedar Park Apartments · Pay app #4

Continuation sheet · Period to March 31

Ready for review
Description of workCompleteThis period
Underground, Bldg B$64,000 scheduled100%$19,200
Rough-in, L2$88,000 scheduled80%$26,400
Fixtures, stored on site$74,000 scheduledStored$31,500
Top-out, L2$52,000 scheduled50%$26,000
Work and stored this period
$103,100
Less 10% retainage
−$10,310
Current payment due
$92,790

Where it pays off.

Rough-in, L2Inspection passed

Passed on the 24th, billed this month.

Rough-in inspection passes two days before the cutoff. The signed card and photos go in the job file, and the line moves to 80% instead of waiting a month.

COR #9 · Six added lavs, L2Needs pricing

Six more lavs on the second floor.

The GC adds six lavatories to the L2 restrooms. The foreman texts it in, and a COR with fixtures, labor and markup is drafted for your PM to approve.

Pay app #3 · Reduced80% → 65%

The GC cuts your percentage.

The GC marks rough-in down from 80% to 65%. Craftpath adjusts the draft, keeps the photos for next month, and tells you exactly what changed.

Common questions.

What plumbing contractors ask before they start.

Yes. Underground, rough-in, top-out and trim, by floor or building, the way your schedule of values is written. Foremen text rough percentages, and Craftpath maps them to the right lines for your PM to check.

You do. When a foreman reports added fixtures or a relocation, Crafty collects what was done, where and why, with photos, and Craftpath drafts the COR at your rates and markup. Your PM sets the final price and approves it before anything goes to the GC.

Yes. Fixtures and water heaters that arrive before they’re set go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.

No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.

Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.

Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.

No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.

Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.

Still have a question?Talk to the team →

See it on your plumbing jobs.

Bring a recent pay app. 30 minutes.

Book a call