Passed on the 24th, billed this month.
Rough-in inspection passes two days before the cutoff. The signed card and photos go in the job file, and the line moves to 80% instead of waiting a month.
Craftpath runs the back office for plumbing contractors: phase progress, fixture changes, monthly pay apps and collections. Your PMs review and approve every step.
Foreman · Cedar Park Apartments
Underground done in building B. Top-out on L2 about 50.
March pay app
LoggedWas 0% in February · 5 photos attached
What Craftpath handles between your foreman's first text and the check clearing. Every item waits for your team's approval.
Underground, rough-in, top-out and trim, by floor or building. Crews text rough percentages, and Craftpath turns them into a G703 your PM can check line by line.
Cedar Park Apartments · Pay app #4
Continuation sheet · Period to March 31
| Description of work | Scheduled | Complete | This period |
|---|---|---|---|
| Underground, Bldg B$64,000 scheduled | $64,000 | 100% | $19,200 |
| Rough-in, L2$88,000 scheduled | $88,000 | 80% | $26,400 |
| Fixtures, stored on site$74,000 scheduled | $74,000 | Stored | $31,500 |
| Top-out, L2$52,000 scheduled | $52,000 | 50% | $26,000 |
What plumbing contractors ask before they start.
Yes. Underground, rough-in, top-out and trim, by floor or building, the way your schedule of values is written. Foremen text rough percentages, and Craftpath maps them to the right lines for your PM to check.
You do. When a foreman reports added fixtures or a relocation, Crafty collects what was done, where and why, with photos, and Craftpath drafts the COR at your rates and markup. Your PM sets the final price and approves it before anything goes to the GC.
Yes. Fixtures and water heaters that arrive before they’re set go on the stored materials column, with the invoice, delivery ticket and photos the GC asks for. Stored materials rules vary by contract, so your PM approves the line before it goes out.
No. Foremen text progress and photos to Crafty, the same way they’d text a PM. Crafty asks a short follow-up when something isn’t clear, then logs it to the right job and line item.
Pay apps are built on your schedule of values in G702 and G703 format, with the backup and waivers each GC asks for. Every GC is a little different, so on the first call we’ll go through your GCs’ forms and portals and show you what Craftpath handles for each.
Craftpath works out what stopped it, like a missing waiver, an unsigned form or a disputed line, and pulls together what’s needed to fix it. If the fix changes a dollar amount or the scope, your team decides. Nothing is resubmitted without your approval.
No. Your accounting system, project tools and GC portals stay where they are. Craftpath works alongside them and handles the work that falls between them: getting field progress into billing, change orders onto the schedule of values, and payments tracked against what you billed.
Anything that affects money, scope or your relationship with the GC. That includes pricing change orders, changing a billed amount, accepting a reduction, settling a dispute, and approving what gets sent. Craftpath does the paperwork around those decisions so your team only has to make them.
Bring a recent pay app. 30 minutes.